Scheduled
Dear Customer,
We would like to Remind you about a planned work scheduled in Shacham Tech Data Center.
PW Reference Number: 50317
Location: Shaham 40 Petach Tikva. Data Center, Data Hall -A
Maintenance Window:
Start date/time: 25-05-2026 20:00 UTC
End date /time: 26-05-2026 02:00 UTC
Scope of work: Mechanical Bypass System Installation for the Phase B Power Feed
Impact: No impact is expected*
MOP: Maintenance will be performed on one power feed at a time. During the work window,* only one power feed will remain active
Important note: During this Installation, there will be a planned shutdown of Feed B. Consequently, there is a risk of power loss to any equipment that is not properly dual-homed (redundantly powered).
Please verify the following prior
- All equipment is connected to dual power feeds (A+B).
- There is no power overload on any of the PDU banks.
- All power supply units (PSUs) are functional and operating as required.
If you have any further inquiries regarding this work, please do not hesitate to contact us.
Always at your service, Interhost.
sorryapp-import ยท 2026-04-16 09:59:17 UTC