Please be advised of a planned maintenance activity at the Shacham Tech Data Center.

Maintenance Details

Reference Number: PW-52023
Location: Shacham 40, Petach Tikva
Start Time: 07-Dec-2026 20:00 (UTC)
End Time: 08-Dec-2026 04:00 (UTC)
Assets being maintained: High Voltage Systems, Transformers, Mains, Emergency stoppers

MOP: As part of the maintenance procedure, the facility will transition from IEC utility power to generator power and will return to IEC utility power once the maintenance has been successfully completed.

Expected Service Impact: No impact is anticipated.

Customer Action Required: No customer action is required.

Risk Assessment: Low risk of power loss on one of 2 if a Generator fails. Returning to IEC power will take 15 minutes on the Power Leg affected.

Always at your service, Interhost.